EN54 FIREFINDER PLUS INSTALLATION,COMMISSIONING & OPERATION
16 Maintenance and Troubleshooting Chart
16.1 Maintenance
The FireFinder PLUS FACP should be maintained so as to comply with all standards / regulations
applicable to the country and location it has been installed. Failure to do so could put at risk
compliance and the integrity of the system. As a minimum it is recommended the following be used
as a guide to periodic maintenance especially if there is an absence of standards regulations.
General
To implement a site maintenance regime, responsibilities should be established by responsible
persons, training implemented if required, maintenance delegates appointed and all outcomes
clearly communicated to all parties.
Daily Operations (operator level)
The delegated operator checks for normal operation
If any faults are detected, record them in an established “Site Log Book” and report them to
the assigned body.
Ensure all faults are signed off as they are resolved and follow up on those that are still
outstanding.
Monthly Operations (operator level)
In addition to Daily Operational checks
Visually inspect in and around the panel for any signs of pests, moisture or general damage
Ensure any non FACP standby power facilities are in a state of operational readiness
Force a suitable device, such as an MCP or detector, into an alarm state so that it generates
a know alarm outcome. This process should be controlled and established in consultation
with all interested parties (installing engineers include) so that maximum benefit is obtained
from the test.
Ensure the Site Log Book” is up to date, faults have been attended to and the latest test are
recorded
Quarterly Operations (service contractor)
In addition to Monthly Operational checks
Check all internal connections and perform “alarm”, “fault” and site specific tests
Perform a “walk around” of the site to determine if the system integrity is free of possible
faults
Ensure the Site Log Book” is up to date, faults have been attended to and the latest test are
recorded
Annual Operations (service contractor)
In addition to Monthly Operational checks
Initiate both a “lamp” and walk” test and any other tests as determined necessary for the
site
Inspect and test ( as per the manufacturers specifications ) batteries
Ensure the Site Log Book” is up to date, faults have been attended to and the latest test are
recorded
Replacement Components (service contractor)
Batteries and fuses are seen as the only field replaceable components.
If a board field change is required all necessary anti-static precautions must be taken.
Note: If the Main Board is changed the power supply may require re-calibration.